Customization: | Available |
---|---|
After-sales Service: | Free Online After-Sale Service |
Characteristics Of Goods: | Customized |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Strong Steel Structure Workshop
Name | Specification |
Size | As customer |
Material | Q235B and Q345B |
Surface | Painted or Hot Dip Galvanized |
Installation | We can provide the complete instructions for installation, or technical support by assigning our engineer on site. |
Packing | 1.Packing the pipes into the bundles by the steel strip 2.packing the welded steel structure parts by some fabric 3.packing the small parts by bags and EPS foam 4.packing sets parts by some box 5.Load in to 40ft GP,20ft GP or 40OT |
Floor | Wooden floor/Cement floor/Steel floor Floor insulation EPS/Rockwool/Glasswool/PU sandwich panel |
Wall | Steel frame, EPS/Rockwool/glasswool/PU sandwich panel or galvanized steel sheet |
Window | PVC or aluminum sliding window |
Door | Sandwich panel door, aluminum rolling door or industrial door |
Roof | EPS/rockwool/glasswool/PU corrugated sandwich panel or galvanized steel sheet |
Electricity | CE Standard,Australia Standard,UL Standard |
Gutter | Stainless steel or color steel sheet |
Rainspout | PVC |
Live load on roof | In 120kg/Sqm (Color steel panel surrounded) |
Wind resistance grade | 12 |
Earthquake-resistance | 8 degree |
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
Project scope
1.Industrial plane/workshop/warehouse/factories, airport terminal, highrise building, bridge, exhibition hall, stadium and so on.
2.We can also develop and produce new parts according to your requirements.
2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 30 to 50 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.