Application: | Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge |
---|---|
After-sales Service: | Installation Guidence |
Warranty: | Installation Guidence |
Type: | H-Section Steel |
Standard: | GB, ASTM, DIN, JIS, AISI, BS |
Trademark: | Low-alloy High-tensile Structural Steel, XGZ |
Customization: |
---|
Suppliers with verified business licenses
Brand name |
Qingdao XGZ Group |
Model |
1.Single slope, Double slope, Multi-slope. |
2.Single span, Double-span, Multi-span, Single floor, Double floors. |
|
Column and beam |
1.Material Q345(S355JR)or Q235(S235JR) steel. |
2.All bolts connecting. |
|
3.Straight cross-section or Variable cross-section. |
|
Surface |
Hot-dip galvanized or painted. |
Roof and wall panel |
1.EPS ,PU ,Rock wood sandwich panel. |
2.Single colorful corrugated steel sheet0.326~0.8mm thick, YX28-205-820(820mm wide). |
|
3.Sandwich panel with EPS, ROCK WOOL, PU etc insulation thickness around 50mm~150mm, 950mm or 960mm width. |
|
Brace |
X or V as well as other type bracing made from angle, round pipe etc. |
Accessories |
Semi-transparent skylight belts, Ventilators, down pipe, outer gutter etc. |
Window |
PVC or Aluminum Alloy. |
C or Z purlin |
Size from C120~C320, Z100~Z200. |
Door |
Sliding or Rolling up door. |
Carrying capacity |
1.Resisting winds and seismic impacts. |
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
Project scope
1.Industrial plane/workshop/warehouse/factories, airport terminal, highrise building, bridge, exhibition hall, stadium and so on.
2.We can also develop and produce new parts according to your requirements.
2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 30 to 50 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
Suppliers with verified business licenses