Customization: | Available |
---|---|
Service Life: | 50 Years |
Frame Main Material: | H Section, C Section, Z Section |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Brand name | steel structure building |
Model | 1.Single slope, Double slope, Multi-slope. |
2.Single span, Double-span, Multi-span, Single floor, Double floors. | |
Column and beam | 1.Material Q345B or Q235steel. |
2.All bolts connecting. | |
3.Straight cross-section or Variable cross-section. | |
Surface | Hot-dip galvanized or painted. |
Roof and wall panel | 1.Single colorful corrugated steel sheet 0.326~0.8mm thick. |
2.Sandwich panel with EPS, Rock wool, PU,Liber glass wool etc insulation thickness around 50mm~150mm, 950mm or 960mm width. | |
Crane | 5T, 10T, 15T, 30T, etc or None |
Brace | X or V as well as other type bracing made from angle, round pipe etc. |
Accessories | Semi-transparent skylight belts, Ventilators, down pipe, outer gutter etc. |
Window | PVC or Aluminum Alloy. |
C or Z purlin | Size from C80~C300, Z120~Z300. |
Door | Sliding or Rolling up door. |
Carrying capacity | 1.Resisting winds and seismic impacts. |
2.Bearing heavy snows. | |
Drawing | 1.Making the design and quotation according to your requirements very soon. |
2.Making the quotation according to your drawings. | |
3.Giving you the satisfying opinion to your project. | |
Certificate | CE/ISO9001:2008/SGS/BV |
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
Project scope
1.Industrial plane/workshop/warehouse/factories, airport terminal, highrise building, bridge, exhibition hall, stadium and so on.
2.We can also develop and produce new parts according to your requirements.
2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 30 to 50 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.