Customization: | Available |
---|---|
After-sales Service: | Installation Guidence |
Application: | Container Home |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Detailed description of Container house | ||
Dimension | Length | customer designed |
Width | customer designed | |
Height | customer designed | |
Weather condition | Wind speed | m/s or km/h |
Snow load | kg/m2 | |
Earthquake | degree | |
Life span | 25-50 years | |
House | Steel Frame | Q235, panited or HDG |
Wall panel | EPS, Glass wool, Rockwool, PU, etc sandwich panel | |
Heat Insulation THK.:50-150mm; Steel sheet THK. :0.3-0.7mm | ||
Roof panel | EPS, Glass wool, Rockwool, PU, etc sandwich panel | |
Heat Insulation THK.:50-150mm; Steel sheet THK. :0.3-0.7mm | ||
Door | Sandwich door; PVC door | |
Window | PVC sliding window;Aluminum alloy sliding window | |
Surface | Panited surface | Antirust paint,total thickness: 100-120um; Warranty period: 18-20 years |
Hot dip galvanized surface | 65,86um; Warranty period: 45-50 years | |
Accessories | Hydroelectric system | Hydroelectric plan |
Ventilation system | Providing design | |
Floor | PVC floor; Plywood floor | |
Heating system | Providing design | |
Delivery time | 20-25days | |
Shipment | One 40HQ container for loading about 160-250m2 |
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
Project scope
1.Industrial plane/workshop/warehouse/factories, airport terminal, highrise building, bridge, exhibition hall, stadium and so on.
2.We can also develop and produce new parts according to your requirements.
2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.