Customization: | Available |
---|---|
After-sales Service: | Installation Guidance& After-Sale Feedback |
Manufacturing Method: | Machine Welding |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Xinguangzheng Steel Fabricated House Structural Roofing Warehouse Workshop is consisted of outer steel plate, fireproof rock wool insulation board, waterproof sealant, board screws and double-layer lighting belt.
1. The main components of theXinguangzheng Steel Fabricated House Structural Roofing Warehouse Workshop are from bottom to top: anchor bolts, steel columns, steel beams, driving beams, brake trusses, inter-column supports, horizontal supports, corner braces, tie rods, braces, roof purlins, walls Face purlins.
Door frames, gutters, roof panels, daylighting panels, wall panels, trim panels, downpipes, aluminum alloy windows, rolling shutter doors, crane ladders, roof maintenance ladders and other components.
2. Advantages of Xinguangzheng Steel Fabricated House Structural Roofing Warehouse Workshop:
(1) Wide range of uses: applicable to factories, warehouses, office buildings, gymnasiums, hangars, etc. It is not only suitable for single-story long-span buildings, but also can be used to build multi-storey or high-rise buildings.
(2) The building is simple and the construction period is short: all components are prefabricated in the factory and only need to be assembled on site, which greatly shortens the construction period. A building with an area of 6,000 square meters can be basically installed in 40 days.
(3) Durable and easy to maintain: steel structure buildings designed by general-purpose computers can resist harsh weather and only need simple maintenance.
3. Work process for Xinguangzheng Steel Fabricated House Structural Roofing Warehouse Workshop
The steel components are prefabricated in the factory are generally adopted to be installed on site, which roughly includes
(1) Main structure hoisting
(2) Secondary structure installation
(3) Roof panel and insulation layer installation
(4) Wall surface maintenance and installation
(5) Detailed structure.
4. Specification of Xinguangzheng Steel Fabricated House Structural Roofing Warehouse Workshop
Main steel frame |
Xinguangzheng Steel Fabricated House Structural Roofing Warehouse Workshop |
Secondary frame |
Galvanized C/Z purlin , steel bracing , tied bar , knee brace , edge cover etc. |
Roof & Wall panel |
Sandwich panel ,corrugated steel sheet or skylight panel |
Tie Rod |
Circular Steel Tube |
Brace |
Round Bar |
Knee Brace |
Angle Steel |
Roof Gutter |
Color Steel Sheet or galvanized Steel sheet |
Rain spout |
PVC Pipe |
Door |
Swing door,sliding door or roller door |
Windows |
PVC steel or Aluminum Alloy Window |
Connecting |
Anchor bolt, high-strength bolt , common bolt |
Packing |
according to the pack list made by our engineer |
Drawing |
We can make the design and quotation according to your requirement or your drawing |
Installation |
Provide full set of drawings and video to direct installation;Engineer are able to stay at site to direct construction |
Our company Qingdao Xinguangzheng steel structure Group is now the first steel structure listed/public group company (New OTC Market) of Qingdao after a 25-year stable development.1000 workers(more than 100 engineers), 6 workshops total 360,000 square meters, 100000 tons fabrication capacity each year,more than 25 years experience, steel buildings built in more than 120 countries &areas, ISO & CE &SGS & BV certificated, 30 minutes reach Qingdao Jiaodong 4F international airport and one hour reach Qingdao port.These are how to keep good quality and competitive prices for global valued customers.
We provide one-stop service of steel structure buildings including design,fabrication and installation guidance,etc.