Customization: | Available |
---|---|
After-sales Service: | Installation Guidence |
Characteristics Of Goods: | Customized |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item | Material | Description and surface process | |
Main steel frame |
Column and Beam | Q235 or Q345 | H section steel with two coats of mid-gray paint |
Purlin | Q235 or Q345 | Galvanizd C or Z type steel | |
Connecting Pieces |
Tie tube | Q235 | Circular Tube with two coats of mid-gray paint |
Knee-Bracing | Q235 | L50*4 Galvanizd angle steel | |
Strutting piece | Q235 | φ12 Galvanizd Circular Tube | |
Column Bracing | Q235 | Circular Tube with two coats of mid-gray paint | |
Horizontal Bracing | Q235 | Circular Tube with two coats of mid-gray paint | |
Casing | Q235 | φ30*2.5 Galvanized Circular Tube | |
Door and Window |
Item | Description | |
Door | Roller shutter door or Sliding door | ||
Window | PVC Window or aluminum alloy window | ||
Other parts |
Ventilating device | Fan,Ventilation window | |
Bolt | Foundation bolt,High strengthen bolt, Normal bolts | ||
Skylight | Yx-840 Glass Fiber Reinforced Plastics | ||
Out/Inner ridge tile | 0.50mm Color sheet | ||
Crane beam | Q235 or Q345 H section steel with two coats of mid-gray paint |
1) Enviromental friendly
2) Lower cost and maintenance
3) Long using time up to 50 years
4) Stable and earthquake resistance up to 9 grade
5) Fast construction, time saving and labor saving
6) Good appearance
PACKAGING OF STEEL PARTS DETAILS:
PACKAGING& LOADING
1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
Port
TRANSPORTATION
We have more than 10 logistics companies that have cooperated with us for many years and can apply for the most favorable transporation charage for you.
Brand name |
Qingdao XGZ Group |
Model |
1.Single slope, Double slope, Multi-slope. |
2.Single span, Double-span, Multi-span, Single floor, Double floors. |
|
Column and beam |
1.Material Q345(S355JR)or Q235(S235JR) steel. |
2.All bolts connecting. |
|
3.Straight cross-section or Variable cross-section. |
|
Surface |
Hot-dip galvanized or painted. |
Roof and wall panel |
1.EPS ,PU ,Rock wood sandwich panel. |
2.Single colorful corrugated steel sheet0.326~0.8mm thick, YX28-205-820(820mm wide). |
|
3.Sandwich panel with EPS, ROCK WOOL, PU etc insulation thickness around 50mm~150mm, 950mm or 960mm width. |
|
Brace |
X or V as well as other type bracing made from angle, round pipe etc. |
Accessories |
Semi-transparent skylight belts, Ventilators, down pipe, outer gutter etc. |
Window |
PVC or Aluminum Alloy. |
C or Z purlin |
Size from C120~C320, Z100~Z200. |
Door |
Sliding or Rolling up door. |
Carrying capacity |
1.Resisting winds and seismic impacts. |
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
Project scope
1.Industrial plane/workshop/warehouse/factories, airport terminal, highrise building, bridge, exhibition hall, stadium and so on.
2.We can also develop and produce new parts according to your requirements.
2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 30 to 50 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.