Workshop Warehouse Steel Structure Building for Food Storage

Product Details
Customization: Available
After-sales Service: Installation Guidence
Install: Support Installation
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
23
Year of Establishment
2016-09-12
  • Workshop Warehouse Steel Structure Building for Food Storage
  • Workshop Warehouse Steel Structure Building for Food Storage
  • Workshop Warehouse Steel Structure Building for Food Storage
  • Workshop Warehouse Steel Structure Building for Food Storage
  • Workshop Warehouse Steel Structure Building for Food Storage
  • Workshop Warehouse Steel Structure Building for Food Storage
Find Similar Products

Basic Info.

Model NO.
XGZ
Mobility
Fixed
Usage
Customized
Design Parameter
Wind/Snow/Earthquake Load
Life Time
More Than 50 Years
Service
Design, Manufacture, Sell, Install
Surface Treatment
Galvanized or Painted
Roof Insulation
EPS/Firberglass Wool/Rock Wool/PU
Color
White/Navy/Blue/Any Color as Customer Want
Roof/Wall Material
Single Panel/Sandwich Panel
Eaves Gutter
Stainless Steel/Color Sheet
Purlin
Z/C Section Steel
Door
Sliding Door or Swing Door
Window
Plastic-Steel Window, Aluminum Alloy Window
Main Steel Frame
H Steel, Box Steel, U Steel, Channel Steel
Type
H-Section Steel
Application
Steel Workshop, Steel Structure Platform
Warranty
10 Years
Transport Package
20′gp/40′hc
Specification
Customized
Trademark
XGZ, Low-alloy High-tensile Structural Steel
Origin
Qingdao, China
HS Code
9406900090
Production Capacity
5000 Tons/Month

Packaging & Delivery

Package Size
1200.00cm * 215.00cm * 245.00cm
Package Gross Weight
25000.000kg

Product Description

Brief  Introdution
features of light steel structure construction 
1.Flexible layout

2.Good ductility, strong plasticity and deformability, high seismic resistant and wind resistant
3.Quick build and long service time
4.Light weight,high quality and low cost
5.Environmental, Material can be 100% recycled or degraded
Main Steel Frame H-steel,Box-steel,U-steel,C-steel
Frame style Portal frame,Tube frame,Truss frame
Wall and roof Systerm single sheet panel,rockwool sandwich panel,fiber glass sandwich panel,PU sandwich panel,EPS cement sandwich panel
window aluminum alloy window,Plastic-steel window
door industrial door,electrical rolling door,KFC door

 
Our Project cases:
Audi 4S carshop
Workshop Warehouse Steel Structure Building for Food Storage
Workshop Warehouse Steel Structure Building for Food Storage

Austrilian Hungar:

Workshop Warehouse Steel Structure Building for Food Storage
Workshop Warehouse Steel Structure Building for Food Storage
Workshop Warehouse Steel Structure Building for Food Storage
Workshop Warehouse Steel Structure Building for Food Storage
 

XInlitong Warehouse:

Workshop Warehouse Steel Structure Building for Food Storage
Workshop Warehouse Steel Structure Building for Food Storage

 






Light Steel Structure Equipment and Building Material
Workshop Warehouse Steel Structure Building for Food Storage

Packing & Shipping Info

Packing:Seaworthy package that can be loaded in 20'GP/40'GP/40'HQ
Shipping: about 30-40 days after receiving the deposit.
Workshop Warehouse Steel Structure Building for Food Storage


 
Payment Terms
T/T 30% deposit after the order confirmed, and the 70% balance before shippment.
 

Our Advantage & Service
1)Rich experience and professional team
With more than 20 years' experience, our employees have been professionally trained and evaluated in light steel structure construction
2)Strictly quality control, Inspection every production link
There are 2-3 quality inspection personnel in each of our workshop to carry out the product inspection and reinspection
3)Preinstall before delivery
We test assembling after assembling the first batch products, and then batch assembly if they're qualified 4)Prompt Delivery.
Within 25-60 days after the order confirmed, also depends on the fabrication quantity.
 
We offer One stop service from design, manufacture, deliver to installation and after-service.



Workshop Warehouse Steel Structure Building for Food Storage
Certification of our light steel structure constructions

Workshop Warehouse Steel Structure Building for Food Storage

FAQ:

1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
Project scope
1.Industrial plane/workshop/warehouse/factories, airport terminal, highrise building, bridge, exhibition hall, stadium and so on.
2.We can also develop and produce  new parts according to your requirements.

2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 30 to 50 days.

3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers. 

4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.

 



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now