Customization: | Available |
---|---|
After-sales Service: | Installation Guidance& After-Sale Feedback |
Install: | Support Installation |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Brand name |
Qingdao XGZ Group |
Model |
1.Single slope, Double slope, Multi-slope. |
2.Single span, Double-span, Multi-span, Single floor, Double floors. |
|
Column and beam |
1.Material Q345(S355JR)or Q235(S235JR) steel. |
2.All bolts connecting. |
|
3.Straight cross-section or Variable cross-section. |
|
Surface |
Hot-dip galvanized or painted. |
Roof and wall panel |
1.EPS ,PU ,Rock wood sandwich panel. |
2.Single colorful corrugated steel sheet0.326~0.8mm thick, YX28-205-820(820mm wide). |
|
3.Sandwich panel with EPS, ROCK WOOL, PU etc insulation thickness around 50mm~150mm, 950mm or 960mm width. |
|
Brace |
X or V as well as other type bracing made from angle, round pipe etc. |
Accessories |
Semi-transparent skylight belts, Ventilators, down pipe, outer gutter etc. |
Window |
PVC or Aluminum Alloy. |
C or Z purlin |
Size from C120~C320, Z100~Z200. |
Door |
Sliding or Rolling up door. |
Carrying capacity |
1.Resisting winds and seismic impacts. |
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
Project scope
1.Industrial plane/workshop/warehouse/factories, airport terminal, highrise building, bridge, exhibition hall, stadium and so on.
2.We can also develop and produce new parts according to your requirements.
2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 30 to 50 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.