Flat Packed Fast Installation Prefab Steel Structure Container House

Product Details
Customization: Available
Fast Installation: Fast Installation
Material: Steel Structure
Still deciding? Get samples of US$ 2000/Piece
Request Sample

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
23
Year of Establishment
2016-09-12
  • Flat Packed Fast Installation Prefab Steel Structure Container House
  • Flat Packed Fast Installation Prefab Steel Structure Container House
  • Flat Packed Fast Installation Prefab Steel Structure Container House
  • Flat Packed Fast Installation Prefab Steel Structure Container House
  • Flat Packed Fast Installation Prefab Steel Structure Container House
  • Flat Packed Fast Installation Prefab Steel Structure Container House
Find Similar Products

Basic Info.

Model NO.
steel structure
Roof
Heat Insulation Panel+Water Proof
Wall
Heat Insulation Panel
Floor
Metal Frame+PVC Floor
Light
LED Light
Plug
One Plug in with a Switch Box
Door
Metal Door
Window
PVC Window
Dimmension
2.3m*5.8*2.57*
Usage
Warehouse, Villa, Dormitories, Temporary Offices, Workshop
Certification
ISO, CE, SGS
Customized
Customized
Transport Package
Standard Package
Specification
Customized is avalibale
Trademark
XGZ
Origin
China
HS Code
9406900090
Production Capacity
100 Set Per Month

Product Description

Prefabricated materials hot sale container office 

Contact the following to get prices :

 
C.P.: July Zhu      +0086-17806251177
Steel structure products,industrial/commercial steel building,
steel poultry house,prefab house,container house,chicken cages
equipments ans systems


Flat Packed Fast Installation Prefab Steel Structure Container House


<1> Steel structure Frame:


Chinese Standard Q235B steel , high quality ,light self weight . All steel items are prefabricated ,Easy to pack , carry and installation . Labor saving . Connected by bolts .

<2> Material Advantages:

wall and ceiling panels : Polyurethane(PU): heat insulation and fire proof, low thermal conductivity, noise reduction, excellent combustion level, environmental protection, anti-negative wind pressure.

Waterproof Rock Wool: Class A non-combustible, low thermal conductivity,  sound insulation,  waterproof.

Glass Wool: forming, low density, low thermal conductivity, insulation, sound-absorbing performance, anti-corrosion.

EPS foam sandwich panel :Low price , heat insulation .

<3>  Easy to Assembly:

Rapid installation, green environment, no construction waste . Two workers can install it in 1 day . and gildline videoes are provided .

<4>  Livable :

Using high-quality raw materials to reduce formaldehyde release, reduce bacterial growth, indoor has no odor in summer exposure.

<5>  Easy to Transport:
6 standard container houses fit in 1 40HQ conatiner .

Flat Packed Fast Installation Prefab Steel Structure Container House
Flat Packed Fast Installation Prefab Steel Structure Container House
Flat Packed Fast Installation Prefab Steel Structure Container House
Flat Packed Fast Installation Prefab Steel Structure Container House
Flat Packed Fast Installation Prefab Steel Structure Container House
Flat Packed Fast Installation Prefab Steel Structure Container House
Flat Packed Fast Installation Prefab Steel Structure Container House
Flat Packed Fast Installation Prefab Steel Structure Container House
FAQ:

1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
Project scope
1.Industrial plane/workshop/warehouse/factories, airport terminal, highrise building, bridge, exhibition hall, stadium and so on.
2.We can also develop and produce  new parts according to your requirements.

2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 30 to 50 days.

3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers. 

4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now