Prefabrication of Steel Structure Metal Workshop Warehouse Building Materials

Product Details
Customization: Available
After-sales Service: Installation Guidance& After-Sale Feedback
Connection Form: Bolt Connection

360° Virtual Tour

Diamond Member Since 2007

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
23
Year of Establishment
2016-09-12
  • Prefabrication of Steel Structure Metal Workshop Warehouse Building Materials
  • Prefabrication of Steel Structure Metal Workshop Warehouse Building Materials
  • Prefabrication of Steel Structure Metal Workshop Warehouse Building Materials
  • Prefabrication of Steel Structure Metal Workshop Warehouse Building Materials
  • Prefabrication of Steel Structure Metal Workshop Warehouse Building Materials
  • Prefabrication of Steel Structure Metal Workshop Warehouse Building Materials
Find Similar Products
  • Overview
  • Company Profile
  • Our Advantages
Overview

Basic Info.

Model NO.
XGZ
Feature
Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable, Customized
Install
Support Installation
Service Life
50 Years
Roof Material
Sandwich Panel
Steel Grade
Q345b/Q235B
Drawing Design
Autocad, Pkpm, Mts, 3D3s, Tarch
Dimensions
as Customers′requirement
Delivery Time
6-8 Weeks
Service
Design Free
Frame Main Material
H Section, C Section, Z Section
Application
Steel Workshop, Steel Structure Platform
Type
H-Section Steel
Standard
GB, ISO, CE, En, BV, SGS
Forming
Hot-Rolled Steel
Member
Steeltruss
Type of Steel for Building Structure
High-Strength Steel
Carbon Structural Steel
Q235
Transport Package
Container Trainsport
Specification
Customized
Trademark
XINGUANGHZENG, Special Purpose Steel
Origin
Shandong, China
HS Code
9406900090
Production Capacity
20000 Pieces/Year

Product Description

Prefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building Materials


Prefabrication of Steel Structure Metal Workshop Warehouse Building Materials

Prefabrication of Steel Structure Metal Workshop Warehouse Building Materials
Prefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building Materials

Prefabrication of Steel Structure Metal Workshop Warehouse Building Materials
Prefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building Materials

Company Profile

Prefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building Materials

Our Advantages

 

1) Surface treatment:

Electro galvanize (1.Surface smooth,and bright,, zinc coating:20-30g/m2,2.In the humid environment,it is easy to rust, But after the rust does not affect use, service life:8-10 years)Because the cost is low, after rust does not affect the use, so most people in use.

hot galvanized (1. surface zinc is thick, can reach about 500g/m2,It has the corrosion resistance of high strength 2. the surface have zinc knot, not smooth, service life: 25 years--Even for a longer time)

Pvc powder after electric galvanized ( 1.Surface smooth,and bright,Color can choose:Red, yellow, blue, green, black, white.2.Because this is two layers of surface treatment, antirust ability enhancement,It is not easy to rust, service life:20 years)

2)Specialty: Easy to assemble. Feeding and easy management, save the space, effectively prevent infectious diseases, and increase the survival rate.

3) Scalability: can be adjusted according to the size, can add automatic drinking water system, also available for one layer or layers adjustment.

4) If there are special specifications, also can be customized to sample. 

Project introduction:
  It is our Ghana layer house project,for total 50400 layers.We are factory since 1996,we are supplier for both steel structure house and auto equipment.
 

FAQ

Q1. You are manufacture factory or trading company?
       A: We are manufacture factory. And you are welcomed to visit us for inspection. The quality control flow will show you ourprofessional. Also you will enjoy the best price and competitive price. 
Q2. Is your price competitive with other companies?
      A: Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost.
Q3. Do you offer service for installation?
      A: We will give detailed installation drawings and video for free. And if you need, we could send engineers as installation director even a team.
Q4. Do you accept container loading inspection?
       A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
Q5. Do you offer designing service for us?
       A:Yes, we could design full solution drawings as your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S, etc. we will be glad to establish sincere business cooperation with you in the near future
Q6. What is the delivery time?
       A: Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving deposit.
Q7. How can you get a quotation for your projects?
       A: You can chat with me anytime via Trade Manager to offer me your detail information or you can just fill out our questionaire(through my email below)and send back to us. We will give you the best quotation ASAP. Thanks for your kind cooperation.

Our service
- Develop and make new parts according to customers' requirements and detailed information.
- Provide service of designing, engineering, manufacturing and installation. 
- Our expert technicians can help you to assemble the project at site. 
-We have more than 23 years designing experience and producing top quality products at competitive prices
-Product have been exported more than 120 countries and regions.



Product Description

Need a price for your steel structure building for workshop and warehouse? Call us or Email us and tell us your planning on project, then your project information will be submitted to our professional salesman and engineer team. We will review your information and reply to you with a quote within three business days. We are always happy to work with you to develop the most cost effective design and give you the most cost effective solutions.
1. Customer-oriented

 We can provide you design and an exact quote within 1-3 business days.  

2. Full technology and engineer support

1) More than 80 professional technicians and qualified R&D Engineers.

2) Based on the concept of modern design and corresponding national standards.

3) Most optimized design high-efficiently with the use of advanced internal aid design software, such as PKPM , TEKLA and 3D3S.

4) Complete set of building and installation drawings to ensure the high-efficient and accurate operation.

5) Skilled erection team can make the building erection fast, safe and qualified at your site.

3. Professional manufacture

1) 700 workers, 60000 m2 workshop, 25 years' experience, CE &ISO&BV&SGS certificated, one hour reach Qingdao port.

2) 5 light/heavy H steel production line, BOX production line , 6 C/Z purlin production line and varies profiling steel sheet rolling and sandwich panel forming lines.

3) The production capacity: Monthly main steel structure 4000mts, secondary steel 2500mts, various profiling steel and sandwich panels 50 thousands sqm.

4. Strict quality control

We perform strict quality control system for material, fabrication process and completion. Third party inspection e.g. SGS/BV/TUV

Looking forward to build the business relationships with you!
  A36 Q235 S235
Yield Strength 250Mpa (36Ksi) 235Mpa ≥225 Mpa
Tensile Strength 400-500Mpa (58-80Ksi) 375-500Mpa 360-510Mpa
Ultimate Analysis C≤0.25% C≤0.12-0.2% C≤0.17%
  Si≤0.4% Si≤0.3% Si≤0.35%
  S≤0.05% S≤0.045% S≤0.030%
  P≤0.04% P≤0.045% P≤0.030%
      Mn≤1.40%
Prefabrication of Steel Structure Metal Workshop Warehouse Building MaterialsPrefabrication of Steel Structure Metal Workshop Warehouse Building Materials

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now