Connection Form: | Bolt Connection |
---|---|
Certificate: | SGS, ISO, GB, BV |
Lifetime: | >50 Years |
Service: | Design, Engineering, Erection |
Design Code: | Wind Load, Snow Load and Earthquake |
Type: | Light Section Steel |
Customization: |
---|
Suppliers with verified business licenses
Name | Specification |
Length | Single slope, double slope, muti slope |
Width | Single span, double-span, Multi-span |
Height | single floor, double floors |
Column | Q235, Q345 welding H section steel |
Beam | Q235, Q345 welding H section steel |
Purlin | Q235 C channel or Z channel |
Knee brace | Q235 angle steel |
Vertical and transversal support |
Q235 angle steel, round bar or steel pipe |
Tie bar | Q235 steel pipe |
Brace | Q235 round bar |
Cladding system | sandwich panels (EPS, PU, Fiber glass wool etc.) or can use corrugated steel sheet with fiber glass wool insulation and steel wire gauze. |
Partition wall | sandwich panels (EPS, PU, Fiber glass wool etc.) |
Ventilation: | ventilator |
Door | sandwich panel sliding door or roller door |
Gutter | stainless steel or color steel sheet |
Rainspout: | PVC |
Live load on roof | In 120kg/Sqm (Color steel panel surrounded) |
Wind resistance grade | 12 |
Earthquake-resistance | 8degree |
Structure usage | Up to 50 years |
We can provide the quotation , if you confirm the information as bellow:
1.Data for design
*Wind speed(KM/H)
*Snow load (KG/M2)
*Rain load (KG/M2)
*Earthquake load if have
*Demands for doors and windows
*Crane (if have) ,Crane span, crane lift height, max lift capacity, max wheel pressure and min wheel pressure!
2.material quality
*Windows and doors quantity,size and location
*Roof and wall material ,sandwich panel or corrugated steel sheet (steel sheet can not heat insulation)
3.Type
*size--width,length,eave height and roof slope
*single slope or double slope
* single floor,double floor or multi floor
our company information
We are a group of 5 factories from 1996 years , We are the biggest and earliest steel structure product exporter and manufacture in steel structure building ( including chicken farm , warehouse , workshop , hangar , garage and so on ) . prefab house , container house in North of China . Now a new factory are ready to build to increase the production capacity . we have more than 600 workers and about 100 engineers including 10 senior engineers . " Moral personality decides product quality "is our guarantee to the products . " Customers come first " is our everlasting pursuit .
Packaging Details
Packing the pipes into the bundles by the steel strip 2.packing the welded steel structure parts by some fabric 3.packing the small parts by bags and EPS foam 4.packing sets parts by some box 5.Load in to 40ft GP,20ft GP or 40OT
Delivery Time:10-15 days
Excellent Service:
1. Be promptly to reply each inquiry within 5 hours
2. We can provide the customer with Installation and construction drawing, video,also
3.we can send our engineer to the projector
Suppliers with verified business licenses