Factory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling Foundation

Product Details
Customization: Available
Type: Carbon Steel Bar
Standard: AISI, ASTM, DIN, JIS, GB, BS
Still deciding? Get samples of US$ 30/Piece
Request Sample

360° Virtual Tour

Diamond Member Since 2007

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
23
Year of Establishment
2016-09-12
  • Factory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling Foundation
  • Factory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling Foundation
  • Factory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling Foundation
  • Factory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling Foundation
  • Factory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling Foundation
  • Factory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling Foundation
Find Similar Products
  • Overview
  • Product Description
Overview

Basic Info.

Model NO.
XGZ
Composition
Ferrous Steel Scrap
Technique
Hot Rolled
Shape
Bar
Surface Treatment
Polished
Special Use
Mold Steel
Application
Die Steel Bar
Structure
Light Steel Roof and Wall Structure
Certification
CE, SGS, BV, ISO
Wind Resistance Capacity
>100km / H
Size
as Customer′s Requirements
Transport Package
Cotton and Plastic Casing
Specification
114*8.56 139*8.56 159*8.56 219*8.56
Trademark
XGZ
Origin
China
HS Code
7304113000
Production Capacity
5000 Tons/Month

Product Description

Product Description

Our Service
1.We offer you quotations according to your drawings.
2.We have engineers with rich enperience to design drawings according to customers' requirements.
3.We offer the whole building for customers, includes design drawings, manufacture and installation.
Workshop, Warehouse, Market, Hotel, Shed, Exhibition Hall, Office Building,Sports 

Pre-sale service
1.We design free drawing according to customers' requests.
2.We offer professional advices according to the local area conditions.
3.We arrange transportation affairs.

Construction stage
1.We supply you with detailed construction drawings to guide.
2.We send one engineer to your local area.
3.We provide related production for your references.

After-sale service
1.We offer reasonable advices for usage, maintenance and techically improve.
2.We offer you a engineer to be in charge of your project.
3.We have on-line service.

Factory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling FoundationFactory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling FoundationFactory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling FoundationFactory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling FoundationFactory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling FoundationFactory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling FoundationFactory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling FoundationFactory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling FoundationFactory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling FoundationFactory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling FoundationFactory Supply Seamless Carbon Steel Pipe Pile Foundation Drilling Foundation




specification:114*8.56  139*8.56  159*8.56   219*8.56
Material;Q345B  J55 N80-1 N80Q
we can manufacture as customer's need or according to customer'drawing 

FAQ:

1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
Project scope
1.Industrial plane/workshop/warehouse/factories, airport terminal, highrise building, bridge, exhibition hall, stadium and so on.
2.We can also develop and produce  new parts according to your requirements.

2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 30 to 50 days.

3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers. 

4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now