Stainless or Seamless Steel Pipe for Pile Foundation Drilling

Product Details
Customization: Available
Type: Carbon Steel Bar
Standard: AISI, ASTM, DIN, JIS, GB, BS
Still deciding? Get samples of $ !
Request Sample

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
23
Year of Establishment
2016-09-12
  • Stainless or Seamless Steel Pipe for Pile Foundation Drilling
  • Stainless or Seamless Steel Pipe for Pile Foundation Drilling
  • Stainless or Seamless Steel Pipe for Pile Foundation Drilling
  • Stainless or Seamless Steel Pipe for Pile Foundation Drilling
  • Stainless or Seamless Steel Pipe for Pile Foundation Drilling
  • Stainless or Seamless Steel Pipe for Pile Foundation Drilling
Find Similar Products

Basic Info.

Model NO.
XGZ
Composition
Ferrous Steel Scrap
Technique
Hot Rolled
Shape
Bar
Surface Treatment
Polished
Special Use
Mold Steel
Application
Die Steel Bar
Structure
Light Steel Roof and Wall Structure
Size
as Customer′s Requirements
Panel Color
Blue, White Grey or Others
Wind Resistance Capacity
>100km / H
Transport Package
Cotton and Plastic Casing
Specification
114*8.56 139*8.56 159*8.56 219*8.56
Trademark
XGZ
Origin
China
HS Code
7304113000
Production Capacity
5000 Tons/Month

Product Description

Stainless or Seamless Steel Pipe for Pile Foundation Drilling
Stainless or Seamless Steel Pipe for Pile Foundation Drilling
Stainless or Seamless Steel Pipe for Pile Foundation Drilling
Stainless or Seamless Steel Pipe for Pile Foundation Drilling

specification:114*8.56  139*8.56  159*8.56   219*8.56
Material;Q345B  J55 N80-1 N80Q
we can manufacture as customer's need or according to customer'drawing 
Stainless or Seamless Steel Pipe for Pile Foundation DrillingStainless or Seamless Steel Pipe for Pile Foundation DrillingStainless or Seamless Steel Pipe for Pile Foundation DrillingStainless or Seamless Steel Pipe for Pile Foundation DrillingStainless or Seamless Steel Pipe for Pile Foundation DrillingStainless or Seamless Steel Pipe for Pile Foundation Drilling
 FAQ:
1.What's the common type of the industrial building?
Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients' request.
2.What are the payment terms?
TT and L/C are acceptable and TT will be more appreciated. 30%deposit before producing, 70% balance before loading by TT.
3.What is the delivery time?
It depends on order quantities and how complicated it is Generally speaking, the delivery time will be within 30 to 50days after deposit.
4.How to pack the products?
We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
5.How to install after the goods arriving destination?
We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now