Gold Member Since 2007
Audited Supplier
Qingdao Xinguangzheng Machinery and Equipment Co., Ltd.

Steel Strucrures for Sport Stadium, Prefab Steel Structures, Steel Structure for Stadium manufacturer / supplier in China, offering Large-Scale China Prefabricated Light Steel Structure for Sports Stadium (XGZ-A022), Polyurethanes Roof and Wall PU Sandwich Panel, Prefabricated High Quality Luxury Sunlight House with Automatic Control and so on.

(/ )

Supplier Homepage Product Steel Structure Building Large-Scale China Prefabricated Light Steel Structure for Sports Stadium (XGZ-A022)

Large-Scale China Prefabricated Light Steel Structure for Sports Stadium (XGZ-A022)

FOB Price: US $35-80 / Square Meter
Min. Order: 500 Square Meters
Min. Order FOB Price
500 Square Meters US $35-80/ Square Meter
Get Latest Price
Port: Qingdao, China
Production Capacity: 5000 Tons/Month
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: XGZ-A022
  • Standard: GB, AISI
  • Forming: Hot-Rolled Steel
  • Member: Steel Column
  • Carbon Structural Steel: Q235
  • Application: Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
  • Life Time: More Than 50 Years
  • Surface Treatment: Galvanized or Painted
  • HS Code: 9406900090, 9406900090
  • Roof/Wall Material: Single Panel/Sandwich Panel
  • Purlin: Z/C Section Steel
  • Specification: Customized
  • Type: Light Section Steel
  • Trademark: Carbon Structural Steel, XGZ
  • Connection Form: Welded Connection
  • Type of Steel For Building Structure: H-Section Steel
  • Residential Wall Structure: Wallboard
  • Design Parameter: Wind/Snow/Earthquake Load
  • Service: Design,Manufacture,Sell,Install
  • Roof Insulation: EPS/Firberglass Wool/Rock Wool/PU
  • Color: White/Navy
  • Eaves Gutter: Stainless Steel/Color Sheet
  • Transport Package: 20′gp/40′hc
  • Origin: Qingdao, China
Product Description
Products Description
1.Flexible layout
2.Good ductility, strong plasticity and deformability, high seismic resistant and wind resistant
3.Quick build and long service time
4.Light weight,high quality and low cost
5.Environmental, Material can be 100% recycled or degraded
 
Basic Facts:

Name of Building:Large-scale China Prefabricated Light Steel Structure Sports Stadium(XGZ-A022)
Structure System: Tube-truss
Area: 1550m2
Construction Site: China
Project:  7 people football stadium.

All of steel truss are  Hot dip Galvanized

 
Project Details:
1.Main Steel Framework(included steel beams and posts)Welded H section Steel,Galvanized
2.Secondary Steel Framework (included purlin, tie bar, bracing bar, angle steel, roof & wall support)C purlin, round steel, steel bar and angle steel
3.Roof and Wall MaterialsEPS insulated steel sandwich panel
4.DoorSliding door
5.WindowAluminum-alloy window
All the design can be customized as required.

Packing & Shipping Info
Packing:Seaworthy package that can be loaded in 20'GP/40'GP/40'HQ
Shipping: about 30-40 days after receiving the deposit.
Large-Scale China Prefabricated Light Steel Structure for Sports Stadium (XGZ-A022)


 
Payment Terms
T/T 30% deposit after the order confirmed, and the 70% balance against L/C at sight.
 
Note;
1) If you have the sketch, drawing or design , pls send us for our quotation.
2) If no drawing, pls tell us more details, then we will design for you.
 

Our Advantage & Service
1)Rich experience and professional team
With more than 20 years' experience, our employees have been professionally trained and evaluated , we can manufacture strictly according to your drawings and request or design by ourselves to provide you a most satisfactory solution to you.
2)Advanced equipment
We also have possessed more than 80 sets of large precise and domestically advanced processing equipment, including large gantry planning machines, automatic submerged arc welding machines, assembling machines, slitters, shot blasting machines and so on.
3)
Strictly quality control, Inspection every production link
There are 2-3 quality inspection personnel in each of our workshop to carry out the product inspection and reinspection
4)Preinstall before delivery
We test assembling after assembling the first batch products, and then batch assembly if they're qualified        
5)Prompt Delivery.
Within 25-60 days after the order confirmed, also depends on the fabrication quantity.
 
We offer One stop service from design, manufacture, deliver to installation and after-service.


Company Profile
Established in 1997,Qingdao Xinguangzheng Steel Structure Co., Ltd is a large-scale professional manufacturer specializing in designing, modeling, manufacturing and installing Steel Structure Projects.

Advanced equipment, great production capacity and prompt delivery  that make us establish good relationship with more than 90 countries and regions:Canada,The United States,UAE,South Africa,Germany,France,Japan,Argentina,Venezuela and many other countries and regions. And we have participated in many significant construction projects,  such as Argentine Workshop, Australian Aircraft Hanger, Mauritius Government Projects and so on.

The company tenet of us is to "perfect itself and create wealth by taking the social development as its responsibility;the enterprise,a platform;and its team, the core of development".Large-Scale China Prefabricated Light Steel Structure for Sports Stadium (XGZ-A022)
Large-Scale China Prefabricated Light Steel Structure for Sports Stadium (XGZ-A022)

Large-Scale China Prefabricated Light Steel Structure for Sports Stadium (XGZ-A022)
Large-Scale China Prefabricated Light Steel Structure for Sports Stadium (XGZ-A022)

FAQ:

1.What's the common type of the industrial building?
Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients' request.
2.What are the payment terms?
TT and L/C are acceptable and TT will be more appreciated. 30%deposit before producing, 70% balance before loading by TT.
3.What is the delivery time?
It depends on order quantities and how complicated it is Generally speaking, the delivery time will be within 30 to 50days after deposit.
4.How to pack the products?
We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
5.How to install after the goods arriving destination?
We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
 
 




 
Send your message to this supplier
Avatar
Miss Kay
Sales Manager
*From:
To: Miss Kay
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category